Professional Design Associates
FEATURED PROJECT
Las Vegas Motor Speedway

PROJECT LISTING:

Desert Breeze Tennis Complex, Las Vegas, NV. Complete electrical engineering services for the pro shop and the tennis complex. The complex includes ten recreational tennis courts, two championship tennis courts with bleachers, a pro shop, and associated parking and green belts.
2003 AIA Nevada Excellence in Design Award Entry

Sunny Springs Park, City of Las Vegas. Complete electrical engineering and lighting design. Most of this park is in a detention basin so the power within the basin is automatically turned off during flooding conditions, including warning lights and delayed egress lighting. The in-ground fixtures shown above required special attention as they are in a pedestrian area and near a water feature. Low lens temperatures were maintained to prevent injury to bare-foot park patrons.
2003 AIA Nevada Excellence in Design Award Entry

Picnic shelter at Ridgebrook Park in Summerlin using indirect lighting to eliminate glare at user areas and highlight the architectural features.No exposed conduits. Even the smallest projects enjoy attention to every detail.

Las Vegas Motor Speedway, Las Vegas, NV. Complete electrical, and plumbing engineering and design for the new Dale Earnhardt Terrace. The existing grandstands at turn-4 were removed and 22,000 new seats were added. The expansion also included eight elevators (with provisions for 8 future), and numerous restrooms, food concession stands, souvenir stands and storage areas on several levels. This design was completed from owner notice-to-proceed to plans check in 15 working days.


Las Vegas Motor Speedway, Las Vegas, NV. Complete electrical, and plumbing engineering and design for the new Richard Petty Terrace. The existing grandstands at turn-1 were removed and 13,350 new seats were added. The expansion also included ten  elevators, and numerous restrooms, food concession stands, souvenir stands and storage areas on several levels. This design was completed from owner notice-to-proceed to plans check in 15 working days.