Professional Design Associates, Inc.

 

 

Military:

 

Creech AFB
Switchgear Repair
Indian Springs, NV


The engineering services for this project were to design/build modifications to the 12.47kV base distribution systems including the addition of switches and sectionalizers, and relocation and addition of several transformers. It required coordination with the base Commander and Nevada Energy.


Creech AFB
Building 3948
Indian Springs, NV


The engineering for this project was to design/build a new Building 3948 including the addition of a service transformer to serve the building. Our capabilities for this project included power, lighting, and communications.

Creech AFB
Repair Buildings 1016 & 1017
Indian Springs, NV


The engineering services for this project were to design/build modifications to Buildings 1016 & 1017 to meet SCIF requirements and interior configuration changes, including the replacement of a service transformer to serve the buildings. The project included power, lighting, and communications.


Nellis AFB
Repair Interior Building 250
Las Vegas, NV


The engineering  for this project was to design/build modifications to Building 250 to provide interior configuration changes, addition of an emergency power distribution system, including the relocation of a service transformer to serve the building. Our capabilities for this project included power, lighting, and communications.


Nellis AFB
Maritime and ISU Shade Structures
Las Vegas, NV


The engineering services for this project were to design/build lighted shade structures for Maritime and ISU storage. The project inculded installation of a new service and service transformer.


Nellis AFB
CAOC-N Bullpen
Las Vegas, NV


The engineering for this project was to design/build a new 2,000A 208/120V service and connection to an existing 900kW emergency generator. Our engineering analysis of the project using Power Analytics DesignBase5 revealed that the long distance between the generator and new service required 12.47kV transformation for the new feeder.

Ft. Irwin
Repair Billets and Latrine/Shower
Ft. Irwin, CA


The services for this project included the design/build a Heat Pump system to replace the existing evaporative coolers and gas fired heating systems, Building # KSP1, KSP2 & RC01. Also, to replace the urinals, water closets , shower heads, stalls, lavatories , soap dispensers, toilet tissue dispensers, shower curtain/rods , exhaust fans and resurfacing and installing concrete floor finishes (ARDEX K301 or approved equal) to Building # 864. 

Ft. Irwin
Augmentee Barracks
Ft. Irwin, CA


Our engineering for this project included the design-build the HVAC system to replace the existing evaporative coolers and gas fired heating systems at Building Nos. 1024, 1026, 1028, 1030 and 1032 with a Dx air conditioning system.

Creech AFB
HVAC Upgrade
Creech AFB
Indian Springs, NV


The engineering for this project involved replacing the existing undersized Dx HVAC system with a new redundant 125-ton air cooled chilled water system for unmanned aircraft support. Our electrical engineering capabilities provided the new power design to support redundant air cooled chillers, backed up by a standby generator. Construction estimate $1.03M.


Creech AFB
Repair 432nd Wing Operations Center, Bldg 1000
Indian Springs, NV


The engineering services for this project were to provide all site investigation and design services for the preparation of construction drawings and Specintact specifications required for the reconfiguration of existing space on the first and second floor of Building 1000 at Creech AFB to accommodate the expansion of the 432nd Wing Operations Center (WOC). The entire newly reconfigured space complys with Sensitive Compartmented Information Facility (SCIF) requirements. Construction estimate $1.3M.